ATC CUSTOMER MEETINGS AND NOTICES

Last updated: November 18, 2009       ATC Customer Relations webpage


MEETINGS AND PRESENTATIONS
INDUSTRY MEETING LINKS
CUSTOMER NOTICES

October 19, 2009: ATC has posted its 2009 Report of the 10-Year Transmission System Assessment to the Web at http://www.atc10yearplan.com/.  In this report, ATC’s planners highlight future electric transmission system challenges and potential solutions.  A printable version of the Report, including Zone Summaries, is available on the Web site now. 

Please contact your ATC regional manager with any questions. Thank you!

 

October 13, 2009:  Wisconsin System Operators (WSO) Training Program—Winter Series

The Wisconsin System Operators program (which includes Alliant Energy, American Transmission Company, Madison Gas and Electric, We Energies, and Wisconsin Public Service) in partnership with the Midwest ISO will be hosting two winter training sessions focusing on system operations, system protection and other related issues.  The sessions will be held on November 3-5 and November 10-12; both sessions will be held at the Hilton Garden Inn in Oshkosh, Wisconsin.  Students attending the program will be able to earn approximately 20-22 Continuing Education Hours and 8 emergency hours; the registration fee for each of the three-day sessions will be $550.00 per person.  More details are available by contacting Pat McMahan at American Transmission Company (pmcmahan@atcllc.com or 608-877-8111).   

 

September 15, 2009:  Wisconsin System Operators (WSO) Training Program—Fall Series

The Wisconsin System Operators program (which includes Alliant Energy, American Transmission Company, Madison Gas and Electric, We Energies, and Wisconsin Public Service) will be hosting two Fall training sessions focusing on error avoidance strategies.  The sessions will be held on September 22-23 and September 29-30; both sessions will be held at the Comfort Suites in Oshkosh, Wisconsin.  Students attending the program will be able to earn approximately 14 Continuing Education Hours (CEHs) and 7 Emergency Hours; the registration fee for each of the two-day sessions will be $475.00 per person.  More details are available by contacting Pat McMahan at American Transmission Company (pmcmahan@atcllc.com or 608-877-8111).   

 

January 30, 2009:  Wisconsin System Operators (WSO) Training Program—Spring Series

The Wisconsin System Operators (WSO) program (which includes Alliant Energy, American Transmission Company, Madison Gas and Electric, We Energies, and Wisconsin Public Service) is hosting three, four-day sessions as part of its Spring WSO series; the Spring sessions will focus on company updates regarding system/infrastructure improvements, selected NERC standards and real time operations, and emergency and restoration scenarios.  The sessions will be held on March 2-5 (Session 1), March 16-19 (Session 2), and March 23-26 (Session 3) at the Park Plaza Hotel and Convention Center in Oshkosh, Wisconsin.  The registration fee will be $700 per person.  More details are available by contacting Pat McMahan at the American Transmission Company (pmcmahan@atcllc.com) or 608-877-8111. 

 

October 13, 2008:  Wisconsin System Operators (WSO)/MISO Training Program—Winter Series

In cooperation with the Midwest ISO, the Wisconsin System Operators program (which includes Alliant Energy, American Transmission Company, Madison Gas and Electric, We Energies, and Wisconsin Public Service) are hosting two Winter training sessions focusing on the MISO Ancillary Services Market.  The sessions will be held on November 5-7 and November 11-13; both sessions will be held at the Park Plaza Hotel and Convention Center in Oshkosh, Wisconsin.  Students participating in the program will be able to earn approximately 18 NERC Continuing Education Hours (CEHs).  More details are available by contacting Pat McMahan at the American Transmission Company (pmcmahan@atcllc.com) or 608-877-8111). 

 

October 8, 2008:  Wisconsin System Operators (WSO) Training Program—Fall Session

The Wisconsin System Operators (WSO) program (which includes Alliant Energy, American Transmission Company, Madison Gas and Electric, We Energies, and Wisconsin Public Service) is hosting a Fall training session focusing on the topic of power system dynamics.  The session will be held on October 21-24 at the Park Plaza Hotel and Convention Center in Oshkosh, Wisconsin.  More details are available by contacting Pat McMahan at the American Transmission Company (pmcmahan@atcllc.com) or 608-877-8111. 

 

September 23, 2008 : ATC has posted its 2008 Summary Report of the 10-Year Transmission System Assessment to the Web at http://www.atc10yearplan.com/.  In this report, ATC’s planners highlight future electric transmission system challenges and potential solutions.  More detailed information on ATC’s plans and planning process is available on the 10-Year Transmission System Assessment Web site, http://www.atc10yearplan.com/.

A printable version of the Zone Summaries is available on the Web site now.  A printed copy of the summary report will be distributed to you in the coming weeks.

Please contact your ATC regional manager with any questions. Thanks!

 

June 19, 2008: As part of its outreach initiative on long-range planning and as follow-up to the previous customer and stakeholder meeting, ATC posted new information on its 10-Year Transmission System Assessment Web site on May 15, 2008: http://www.atc10yearplan.com/A8.shtml. The next customer and stakeholder meeting will be Thursday, June 19 from 9:30am – 1:30pm at MRA Conference Center, N19 W24400 Riverwood Drive, Waukesha, Wisconsin.  Please continue to refer to the Web site and/or OASIS for meeting notices, minutes, analyses and updates.

June 11, 2008: 2007-2009 Long-Term Access Goal Update, as presented at the ATC Board of Directors meeting on February 27, 2008.

June 4, 2008: Empire-Forsyth 138-kV line rating

ATC has improved the summer emergency rating of the Empire-Forsyth 138-kV line from 202 MVA to 300 MVA.

March 4, 2008: The semi-annual transmission planning meeting between ATC and Dairyland Power Cooperative is scheduled for March 4, 2008. Among the topics will be possible future transmission projects in Monroe County, Wisconsin. If you would like further information, please contact Doug Johnson at 262-506-6863.

February 25, 2008: March 2008 – Wisconsin System Operators (WSO) Training Program – Spring Series

The American Transmission Company (ATC), along with several Wisconsin utilities (We Energies, Wisconsin Public Service, Alliant Energy, and Madison Gas and Electric), are hosting three spring training sessions (see attached agenda for dates, topics and speakers; the training will be held at the Park Plaza hotel in Oshkosh, WI). Students attending the program will be able to earn approximately 28 NERC Continuing Education Hours (CEH). Please note that, while the training is specifically designed to meet the training needs of Wisconsin-based system operators, a limited number of spaces have been set aside for others who may be interested in attending. The registration fee for non-WSO members is $750 per person. More details are available by contacting Pat McMahan, Training and Compliance Project Manager for ATC, at pmcmahan@atcllc.com or 608-877-8111. Registration deadline is Friday, February 29.

February 5, 2008: In keeping with its outreach efforts on long-range planning, ATC will host an Economic Project Planning meeting for customers and stakeholders on Thursday, February 21 from 9:30am until Noon at MRA conference center near ATC’s Pewaukee office.  The meeting will examine the historical performance of highly constrained elements of the electric system and their impacts on the delivered cost of electricity.  This evaluation will help ATC identify a set of economic system needs and potential solutions.  A map to the conference center and the meeting agenda are attached to this message.  Please note that a teleconference option will be available for this meeting and lunch will be provided.

 

The precursor to this Economic Project Planning meeting was ATC’s Access Initiative.  The original purpose of the Access Initiative was to examine an interstate transmission line connection between Wisconsin and the Midwest Region with customer and stakeholder input.  ATC’s Access Initiative culminated in 2005 with a decision to pursue regulatory approvals for the Paddock-Rockdale project, now pending before the Public Service Commission of Wisconsin.  The Initiative has now evolved to a broader analysis of future economic constraints and potential solutions.

 

Additional information about this meeting and the economic planning process including meeting notices, minutes, analyses and updates will be made available on ATC’s 10-Year Assessment website and on the OASIS.

 

Please indicate your participation in person or by phone by replying to Terry Peterson no later than end of day Friday, February 15.

 

ATC looks forward to seeing you at the meeting!

 

January 24, 2008: The Arrowhead Stone Lake portion of the Arrowhead-Weston 345-kv transmission line project was placed in service on January 23, 2008, at 1144 am CST. Subsequent outages to this line will be scheduled or noted via the outage coordination process.

January 23, 2008: The newly constructed Arrowhead-Weston 345-kV transmission line was energized on January 23. This information was made available during a meeting with Madison Gas & Electric representatives on January 22. Public information was available indicating the general timeframe for the energization of the Arrowhead-Weston transmission line; however, a specific date for energization had not previously been disclosed.

January 17, 2008: DRAFT Long-Term Access Goal Year-End Discussion prior to ATC Board of Directors Meeting, 01/30/08

January 8, 2008: As noted on the Midwest ISO Outage Scheduler, an outage is scheduled for the period January 4, 2008 through February 15, 2008 in connection with the construction of facilities generally referred to as "Cranberry - Conover - Plains Project."  Because this is an extended outage period and because several areas of ATC's transmission network will not be operated in a network configuration, ATC intends to conduct weekly meetings with representatives of the local distribution companies that may be affected by this construction-related outage, as well as other interested parties.  Those meetings will occur weekly during the outage period.  The purpose of the meetings is to discuss the construction progress and any possible changes to the outage period.  If the period of the outage is changed, ATC will supply the requested change to the Midwest ISO through the outage scheduler.  ATC may also provide inforrmation at the meeting relating to the outage period.  To receive the updated information, please click here

If you have any questions, or require further information, please contact Doug Johnson, ATC's Compliance Manager at 262-506-6863, dfjohnson@atcllc.com.

November 30, 2007: ATC has issued 2007 Zone Summaries, an update to its 2006 10-Year Transmission System Assessment.  In these zone updates, ATC’s planners focus on the projects and needs that had been identified in the previous assessment, and highlight future electric transmission issues and potential solutions.  More detailed information on ATC’s plans and its planning process is available on the 10-Year Transmission System Assessment website: http://www.atc10yearplan.com/.

October 22, 2007: Wisconsin System Operators (WSO) Training Program – Winter Series

The American Transmission Company (ATC), along with several Wisconsin utilities (We Energies, Wisconsin Public Service, Alliant Energy, and Madison Gas and Electric), is hosting two winter training sessions (Session 1-October 29-30, and Session 2-October 31-November 1) focusing on NERC Standards.  Students attending the program at the Park Plaza Hotel in Oshkosh, Wisconsin will be able to earn approximately 14 Standards CEHs and 7 emergency preparedness hours.  Please note that, while the training is specifically designed to meet the training needs of Wisconsin-based system operators, a limited number of spaces have been set aside for others who may be interested in attending.  The registration fee for non-WSO members is $750 per person.  More details are available by contacting Pat McMahan, Training and Compliance Project Manager for ATC, at pmcmahan@atcllc.com or 608-877-8111.  Registration deadline is October 25, 2007.       

October 19, 2007: A meeting to review forecasts and analysis of transmission in Michigan’s eastern Upper Peninsula will be held Monday, October 22, 2007 at 1pm (Eastern) at the Michigan Public Service Commission Office in Lansing, Michigan. Anyone interested in receiving information relating to the transmission operational information that was made available may contact Brett French, ATC regional manager, bfrench@atcllc.com.

October 2007: Wisconsin System Operators (WSO)/MISO Training Program – Fall Series

In cooperation with the Midwest ISO, the Wisconsin System Operators program (which includes Alliant Energy, American Transmission Company, Madison Gas and Electric, We Energies, and Wisconsin Public Service) is hosting two Fall training sessions focusing on the MISO Ancillary Services Market. The sessions will be held on October 11-12 and October 16-17; both sessions will be held at the Park Plaza Hotel and Convention Center in Oshkosh, Wisconsin. Students attending the program will be able to earn approximately 12 Continuing Education Hours (CEHs). More details are available by contacting Pat McMahan at the American Transmission Company (pmcmahan@atcllc.com or 608-877-8111) or Brenda Schuler at the Midwest ISO (bschuler@midwestiso.org or 317/249-5180).

September 24, 2007:  A meeting to review forecasts and analysis of transmission in Michigan’s eastern Upper Peninsula will be held Tuesday, September 25, 2007 at 10am CDT at the Ramada Inn in Sault Ste. Marie, Michigan. Anyone interested in receiving information relating to the transmission operational information that was made available may contact Brett French, ATC regional manager, bfrench@atcllc.com.

September 10, 2007:  A meeting to review forecasts and analysis of transmission in Michigan’s eastern Upper Peninsula was held Thursday, September 6, 2007 at 10am at the Ramada Inn in Sault Ste. Marie, Michigan. Anyone interested in receiving information relating to the transmission operational information that was made available may contact Brett French, ATC regional manager, bfrench@atcllc.com.

July 30, 2007: Ellington-Hintz 138-kV line rating
ATC has improved the summer emergency rating of the Ellington-Hintz 138-kV line from 293 MVA to 397 MVA. Further upgrades are planned for increasing the summer emergency rating to 403 MVA.

May 29, 2007: ATC’s Proposal for Compliance with planning principles adopted by FERC Order No. 890 can be found here.

 

March 1, 2007:  The American Transmission Company (ATC), along with several Wisconsin utilities, will begin hosting the first of three training sessions on Monday, March 5, 2007 (see attached document). For more information or to obtain a CD of the WSO Spring Session training materials, please contact Pat McMahan at the American Transmission Company at pmcmahan@atcllc.com or 608-877-8111. The CD will include the PowerPoint presentations and support materials (minus the simulation exercises); cost per CD is $150. 

February 19, 2007: March 2007 Wisconsin System Operators (WSO) Training Program – Spring Series

The American Transmission Company (ATC), along with several Wisconsin utilities (We Energies, Wisconsin Public Service, Alliant Energy, and Madison Gas and Electric), are hosting three spring  training sessions focusing on generation topics (see attached agenda for dates, topics and speakers). Students attending the program will be able to earn approximately 28 CEHs and 8 emergency preparedness hours. Please note that, while the training is specifically designed to meet the training needs of Wisconsin-based system operators, a limited number of spaces have been set aside for others who may be interested in attending. The registration fee for non-WSO members is $750 per person. More details are available by contacting Pat McMahan, Training and Compliance Project Manager for ATC, at pmcmahan@atcllc.com or 608-877-8111. Registration deadline is March 1, 2007.

February 5, 2007: ATC mistakenly failed to timely update organization chart on OASIS

On February 2, 2007, ATC Management Inc., as corporate manager of American Transmission Company LLC (ATCLLC), posted to the OASIS an update of its organization chart. It appears that the OASIS posting may be two days later than the seven business days posting requirement of 18 CFR Part 358.4(b)(3)(iv).   

 

Organizational changes in ATCLLC’s Asset Management department were made effective on January 22, 2007. While the high level organizational changes were announced to Asset Management department employees, details pertaining to specific job titles were still under review and pending decisions, which were finalized on or around January 31, 2007. A corporate-wide announcement of the changes, and the distribution of the revised organization chart, was done on February 2, 2007. Upon the announcement of the organizational change on February 2, 2007, an assessment of the OASIS posting requirements was made. ATCLLC has conservatively concluded that an OASIS posting update should have been made on or before January 31, 2007. Upon recognition that the OASIS posting update was beyond the seven business day posting requirement, ATC expeditiously made an OASIS posting update which added the revised Asset Management department organization chart to the OASIS site on the afternoon of February 2, 2007.    

 

January 30, 2007: The following notice is being posted at the request of We Energies

"At approximately 0735 on January 30, 2007, the WEC Balancing Authority during the course of routine communications with its affiliated generator operator and generator owners inadvertently disclosed an excursion on the system of about 300 MW relating to an un-named, un-affiliated generator that at the time remained down. While the WEC Balancing Authority does not believe this posting is required, it is made out of an abundance of caution with the intent of compliance with FERC requirements."

 

December 12, 2006: Empire-Forsyth 138-kV line rating
ATC has revised the summer ratings of the Empire-Forsyth 138-kV line to 195 MVA normal, 202 MVA emergency. The summer emergency rating is limited by the line conductor clearance.

 

December 11, 2006: Flow South Flowgate Rating
ATC has completed the reconstruction of the Plains-Stiles 138-kV corridor which connects Northeastern Wisconsin to the Upper Peninsula of Michigan. This multi-year improvement project has resulted in an increase in the normal summer and winter capability of the Flow South flowgate to 300 MW for all seasons.

 

December 7, 2006:  The American Transmission Company (ATC), along with several Wisconsin utilities, will begin hosting the first of two training sessions on Monday, December 11, 2006 (see attached document.)  For more information or to obtain a CD of the WSO Winter 2006 session training materials, please contact Pat McMahan at the American Transmission Company at pmcmahan@atcllc.com or 608-877-8111.  The CD will include the PowerPoint presentations and support materials; cost per CD is $150. 

 

November 29, 2006: December 2006: Wisconsin System Operators (WSO) Training Program – Winter Series

The American Transmission Company (ATC), along with several Wisconsin utilities (We Energies, Wisconsin Public Service, Alliant Energy, and Madison Gas and Electric), are hosting two winter training sessions focused on electricity basics and real and reactive power theory (see attached agenda for dates, topics and speakers). Students attending the program will be able to earn up to 21 NERC Continuing Education Hours (CEH). Please note that, while the training is specifically designed to meet the training needs of Wisconsin-based system operators, a limited number of spaces have been set aside for others who may be interested in attending.  The registration fee for non-WSO members is $850 per person. More details are available by contacting Pat McMahan, Training and Compliance Project Manager for ATC, at pmcmahan@atcllc.com or 608-877-8111. Registration deadline is December 6, 2006.     

 

November 10, 2006: Reminder -- ATC will host its Network Customer Meeting on Thursday, November 16 beginning at 9:30am at the Pewaukee office. The teleconference option information is:

DIAL-IN:    866-621-2153   ACCESS CODE:    3749584

A draft agenda is attached.  Please respond indicating your participation in person or by phone to Terry Peterson by end of day Tuesday, November 14.   We look forward to seeing you at the meeting!

 

November 9, 2006: ATC has issued its 2006 10-Year Transmission System Assessment. The report is posted to http://www.atc10yearplan.com/.

 

November 9, 2006: This week, the Wisconsin System Operators (WSO) group is sponsoring two sessions focusing on MISO's Energy Market from an Operations Perspective. The materials for the training sessions are posted on MISO's public web site at http://www.midwestiso.org/publish/Folder/3c9065_10e9e96031d_-7f960a48324a?rev=1. The WSO group is composed of representatives from American Transmission Company, Alliant Energy, Madison Gas & Electric, WE Energies, and Wisconsin Public Service. For more information contact Pat McMahan at American Transmission Company.

 

November 2, 2006: Please join ATC for its 2006 Transmission Business Briefing for Michigan's Upper Peninsula on Tuesday, November 7 in Marquette, Michigan. The meeting will include presentations on various current topics and opportunites will exist to discuss ATC's projects and activities.

ATC President and CEO José Delgado will be the keynote speaker. George Stojic, director of operations and wholesale markets for the Michigan Public Service Commission, will present an overview of recent MPSC initiatives. Todd Hillman, excecutive director-customer management for the Midwest ISO, will present an update on MISO initiatives.

We are aware that this meeting falls on an election day. Please visit https://www.mcgi.state.mi.us/mivote/voterSearch.aspx to inquire about registering to vote, poll times and locations, as well as how to obtain an absentee ballot.

Please share this invitation with others in your organization that may have an interest in attending this meeting. And feel free to extend this invitation to any of your wholesale or retail customers who may have an interest in learning more about ATC and its plans for the future. We look forward to seeing you in Marquette on November 7!

Please see below in the Meetings and Presentations table for location and details.

 

October 30, 2006: Wisconsin System Operators (WSO) Training Program – Fall Series 

The American Transmission Company (ATC), along with several Wisconsin utilities (We Energies, Wisconsin Public Service, Alliant Energy, and Madison Gas and Electric), is hosting two fall training sessions focused on MISO’s energy market from an operations perspective (see attached agenda for dates, topics and speakers). Students attending the program will be able to earn up to 16 NERC Continuing Education Hours (CEH).  Please note that, while the training is specifically designed to meet the training needs of Wisconsin-based system operators, a limited number of spaces have been set aside for others who may be interested in attending. The registration fee for non-WSO members is $850 per person. More details are available by contacting Pat McMahan, Training and Compliance Project Manager for ATC, at pmcmahan@atcllc.com or 608-877-8111. Registration deadline is November 3, 2006.

 

September 22, 2006: ATC has posted responses to queries it received regarding future generation and transmission congestion. ATC's responses can be found at this link.

For previous postings, please see the Customer Notices archive page.


 

MEETINGS AND PRESENTATIONS

(All times are Central unless indicated otherwise)

 

DATE

TIME

TOPIC

LOCATION

ATTACHMENTS

COMMENTS

November 19 , 2009

9:30 AM-2:00 PM

Network Customer Meeting

ATC's Pewaukee Headquarters

Agenda; 10-Year Assessment Update; La Crosse-Madison Update; EIPC Update; MISO Update; MISO Planning Update; State Regulatory Affairs & Local Relations Update; Jefferson County Project Update; Policy Update; Environmental Update  
September 17, 2009
8:00 AM - 3:30 PM Eastern
UP Energy Summit
Upfront & Company, 102 E. Main St., Marquette, MI
Agenda; Federal Policy Impacts; Transmission Policy Perspectives; Transmission Developments; Industry Perspectives; A View from the Forest Products Sector; Electric Rates, Power Plants, & Renewable Portfolio Standards Brochure

August 20, 2009

9:30 AM-2:00 PM

Network Customer Meeting

ATC's Madison office

Agenda; 10-Year Assessment Update; EIPC Update; La Crosse-Madison Update; MISO Update; ARR/FTR Update; NEV Coordination; State Regulatory Affairs & Local Relations Update; Paddock – Rockdale Project Update; Policy Update  

July 10, 2009

9:30 AM-2:00 PM

ATC Customer/Stakeholder Economic Planning Meeting

ATC Corporate Headquarters

  Please see information posted at http://www.atc10yearplan.com/A8.shtml
March 11, 2009
10:00 AM-2:30 PM
Black Start Meeting
Holiday Inn, 625 West Rolling Meadows Drive,
Fond du Lac
 

February 26, 2009

9:30 AM-2:00 PM

Network Customer Meeting

ATC Corporate Headquarters

Agenda; Regulatory Strategy Update; MISO Update; State Regulatory and Local Relations Update; A-W Benefits; Energy Collaborative; Reliability Performance; ATC Site Visit  

March 6, 2009

9:00 AM-3:00 PM

ATC Customer/Stakeholder Economic Planning Meeting

ATC Corporate Headquarters

  Please see information posted at http://www.atc10yearplan.com/A8.shtml

November 20, 2008

9:30 AM-2:00 PM

Network Customer Meeting

ATC Corporate Headquarters

Agenda; Presentation; MISO Update; MISO Generator Interconnection Queue; State Regulatory Affairs and Local Relations Update; Generator Interconnection Queue; Energy Collaborative Update  
October 29, 2008
8:00 AM-4:00 PM
Transmission Business Briefing
Up Front and Company, 102 E. Main Street, Marquette, MI
Agenda; Planning for the Future; Energy Collaborative; 10-Year Assessment; Northern Umbrella Plan and Capital Projects Update; Policy Initiatives; Operations Initiatives; Asset Management Initiatives; Business Partners Forum

ATC Futures (Text View)


ATC Upper Michigan Energy Collaborative Futures


ATC Futures - ATC Energy Collaborative - Michigan

October 16, 2008
9:30 AM-1:30 PM

ATC 2009 10-Year Transmission System Assessment

Study Scope and Input Solicitation Meeting

MRA Conference Center, N19 W24400 Riverwood Drive, Waukesha, WI
Agenda; Presentation; Futures Matrix; Futures – Summary Descriptions and Voting Block

Teleconference Information:

Dial: 1-866-621-2153

Access Code: 3749584

October 2, 2008

9:00 AM-1:00 PM

Eastern Wisconsin -Upper Michigan Black Start Restoration Future and MISO Black Start Drill Discussion

Manitowoc Public Utilities Corporate Headquarters

Agenda; Directions Minutes

June 26, 2008

9:30 AM-2:00 PM

Network Customer Meeting

ATC Corporate Headquarters

Agenda; Planning Update; Regulatory Strategy Update; MISO Quarterly Update; MISO Market Administration Engineering ; State Regulatory and Local Relations Update

DIAL-IN: 866-621-2153  

ACCESS CODE:    3749584

June 19, 2008

9:30 AM-1:30 PM

ATC Customer/Stakeholder Economic Planning Meeting

MRA Conference Center, N19 W24400 Riverwood Drive, Waukesha, WI

Please see information posted at http://www.atc10yearplan.com/A8.shtml

March 16, 2008

11:00 AM EDT

ATC Energy Collaborative - Michigan

Ramada Inn, Sault Ste. Marie, MI

Presentation None

February 28, 2008

9:30 AM-2:00 PM

Network Customer Meeting

ATC Corporate Headquarters

Agenda; Regulatory Strategy Update; MISO Quarterly Update; MISO Forward RAC Presentation; Planning Update; Arrowhead-Weston Presentation ; State Regulatory and Local Relations Update

DIAL-IN: 866-621-2153  

ACCESS CODE:    3749584

February 21, 2008

9:30 AM-12:00 PM

ATC Economic Project Planning Meeting

MRA Conference Center, N19 W24400 Riverwood Drive, Waukesha, WI

Please see information posted at http://www.atc10yearplan.com/A8.shtml

January 21, 2008

9:30 AM-12:30 PM

ATC Transmission Planning Policy Meeting

MRA Conference Center, N19 W24400 Riverwood Drive, Waukesha, WI

Agenda None

November 29, 2007

8:15 AM-4:00 PM (EST)

ATC Transmission Business Briefing

Up Front & Company, Marquette, MI

Agenda; Northern Umbrella Plan and Projects - Update; Planning Update; ATC Initiative Updates 7:30 AM registration

November 15, 2007

9:30 AM-2:00 PM

Network Customer Meeting

ATC Corporate Headquarters

DIAL-IN: 866-621-2153   ACCESS CODE:    3749584

August 23, 2007

9:30 AM-2:00 PM

Network Customer Meeting

ATC Corporate Headquarters

DIAL-IN: 866-621-2153   ACCESS CODE:    3749584

May 17, 2007

9:30 AM-2:00 PM

Network Customer Meeting

ATC Corporate Headquarters

DIAL-IN: 866-621-2153   ACCESS CODE:    3749584

April 18, 2007

UPPCo Electric Conference

Holiday Inn, 1951 US 41 West, Marquette, Michigan

None

April 4, 2007

Energy Plan '07 -- WPS Retail Customer Meeting

Westwood Center, Wausau

None

April 3, 2007

Energy Plan '07 -- WPS Retail Customer Meeting

The Meadows, Green Bay

None

March 28, 2007

8:30 AM-3:00 PM

Workshop for First Responders and Utility Personnel -- "Maximizing Safety & Information: Minimizing Damage"

Holiday Inn, Marquette, Michigan

None

March 29, 2007

11:00 AM- 12:00 PM

Cost Allocation

ATC Corporate Headquarters

Impact of Alternative Transmission Cost Allocation Designs; XM cost allocation MTEP06 DIAL-IN:    1-866-621-2153

ACCESS CODE:    3749584

March 1, 2007

1:00-3:00 PM

Paddock-Rockdale Analysis

ATC Madison Fen Oak Office

None

February 22, 2007

9:30 AM-2:00 PM

Network Customer Meeting

ATC Corporate Headquarters

DIAL-IN: 866-621-2153   ACCESS CODE:    3749584

January 19, 2007

9:30 - 10:30 AM

Cost Allocation

ATC Corporate Headquarters

Generic analysis of potential cost allocation alternatives (second presentation); MISO project database (draft November 2006) DIAL-IN:    1-866-621-2153

ACCESS CODE:    3749584

January 9 , 2007

2:30 PM-3:30 PM

Cost Allocation

ATC Corporate Headquarters

Generic analysis of potential cost allocation alternatives; MISO Project Database (August 2006) DIAL-IN:    1-866-621-2153

ACCESS CODE:    3749584

November 16 , 2006

9:30 AM-2:00 PM

Network Customer Meeting

ATC Corporate Headquarters

DIAL-IN: 866-621-2153   ACCESS CODE:    3749584

November 7 , 2006

11:00 AM-4:00 PM (EST)

2006 Transmission Briefing for Michigan's Upper Peninsula

Upfront and Company, 102 E. Main Street, Marquette, Michigan

None

September 25, 2006

2:00-4:00 PM

Paddock-Rockdale Analysis

ATC Madison Fen Oak Office

None

September 19, 2006

8:00 AM-12:00 PM

ATC Customer Update and Project Briefing

Marquette, Michigan

None

August 23, 2006

9:30AM-2:00PM

Network Customer Meeting

ATC Corporate Headquarters

Agenda; Antitrust Reminder; MISO Update; CA/CPCN Regulatory Status; Regulatory Update; RECB & 2007 Rates Impact; Arrowhead-Weston Update; Environmental Update; Local Relations Update; Regional Planning; MRO/RFC Coordination; Operations Update; Oak Creek Expansion; Access Initiative Update

None




INDUSTRY MEETING LINKS


MISO Meetings    FERC Meetings    MISO OASIS Home Page(Security certificate is required)    MRO Meetings    Reliability First Meetings