ABOUT US
    What we do
Key facts
Leadership
Contributing owners
Service area
System planning
System operations
Annual Report
Preferred Suppliers
Supplier Processing
In the Community
  RELATED RESOURCES
 
 
ACCESS INITIATIVE  
 

The Access Initiative was ATC's first effort toward what is now referred to as "economic planning".  The Access Initiative began in 2004 with studies on ways to improve local utilities' access to lower cost sources of power in the Midwest region. This effort culminated with a proposal to construct the Paddock Rockdale project. Historic information on the Access Initative is listed below. Our economic planning efforts are ongoing.

 

What is transmission access?
The transmission system is used to deliver electricity from power plants, where it is produced, to the electric distribution system of the local utilities, which delivers it to homes and businesses. With the introduction of the open wholesale electricity marketplace in the late 1990s, the transmission system is required to move electricity beyond the local service area of a utility. It now must be able to move large quantities of power into, out of and through a greater region so that utilities have the option to buy and sell electricity when it's economic to do so. The ability of the transmission system to handle this type of electricity traffic is known as transfer capability. Access refers to the ability of customers to use the system's transfer capability to access power available in adjacent utility or energy markets. Due to the age and configuration of ATC's transmission system, transfer capability is limited. As a result, ATC launched an Access Initiative in 2004 to study ways to improve transfer capability and assess the benefits and costs associated with developing transmission connections with adjacent areas.

Access Initiative Files, Data and other Meeting Materials:
Last updated 01/10/2008

PSC schedules hearings on Paddock Rockdale project

Posted January 10, 2008

PSC hearing set

New Materials Posted June 14, 2007

ATC Project Update -- June 14, 2007

New Materials Posted June 13, 2007

ATC's Load-Weighted LMPs With and Without Paddock-Rockdale for 2011 and 2016 For the Various Futures

New Materials Posted May 16, 2007

Economic and Planning Analysis for the Paddock-Rockdale Transmission Project, filed with the PSCW on May 16, 2007 [137-CE-149].

New Materials Posted February 28, 2007

Paddock-Rockdale Need Analysis Results

Agency Consultative Close-Out Meeting February 7, 2007

Docket 137-CE-149

ATC is meeting with PSCW and DNR Staff today and presenting preliminary economic analysis for the Paddock-Rockdale project. Final results will be posted at a later date. If you have any interest in obtaining the preliminary results, please contact Ken Burruss at 608-877-7648 or kburruss@atcllc.com.

New Materials Posted November 22, 2006

Paddock-Rockdale Stakeholder Meetings Results Presentation Q&A. This Q&A file is a follow-up to the Need Analysis Results posted below on September 21.

New Materials Posted September 21, 2006

Paddock-Rockdale Need Analysis Results [updated 9/26/2006]

New Materials Posted September 13, 2006

The results of the Paddock-Rockdale line analysis will be posted on the OASIS on Thursday, September 21, 2006. A detailed review of the results will be held at our Madison Fen Oak office on September 25 at 2:00 PM.

New Materials Posted April 5, 2006

G527 Tie Line Flows. This report contains a comparison of the intact system tie line flows with and without generator-transmission interconnection request G527 in service.

New Materials Posted February 13, 2006

Access Initiative Base Case Hourly Zonal LMPs for 2013. These are hourly LMP results based on 2005 Access base case runs (corresponding to ATC's filing to the PSCW on 8/15/05). Results are from PROMOD analysis.

New Materials Posted January 9, 2006

Public Service Commission of Wisconsin webpage

PSCW Commission Staff Draft Report on the Access Study Initiative [137-EI-100]

New Materials Posted December 20, 2005

G527 Draft Interconnection System Impact Study Report with FCTTC results

G528 Draft Interconnection System Impact Study Report with FCTTC results

These reports contain additional sensitivity analysis of total simultaneous import capability (FCTTC) values related to the Access Initiative.

New Materials Posted December 8, 2005

ATC's comments filed December 5 at the PSCW regarding the November 17, 2005 Commission Staff Draft Report on the Access Study Initiative

New Materials Posted August 23, 2005

July 21 Access Meeting notes

New Materials Posted August 22, 2005

Capacity Factors From the Baseline Studies and the Southern and Southwestern Alternatives 7-21-2005

Access filing documents and materials

New Materials Posted August 15, 2005

PSC Docket 137-EI-100 ATC documents filed this day

Filing Letter

Analysis and Comments

Access Study Initiative Report

Other Factors Report

Access Study Initiative Appendices

 

New Materials Posted August 11, 2005

Generation external to Wisconsin included in PowerBase cases

Meeting materials for July 21, 2005 Access Customer/Stakeholder Meeting

Agenda

Anti-trust reminder

ATC Access Initiative August 1 Filing
PROMOD Economic Analysis

Transfer Capability

Project Package Selection

Assessment of Other Factors, ATC's Access Initiative


New Materials Posted May 25, 2005
March 16th Access Meeting notes

New Materials posted May 17, 2005
Decision Matrix
LMP Comparison Video (when dialog box appears, choose "save" option)

Meeting materials for May 16, 2005 Access Customer/Stakeholder Meeting
Agenda
Anti-trust reminder
Sensitivity Prioritization Results
Access Project Cost Estimates
PROMOD Economic Analysis
Capacity Factors
Net Interchange charts
Decision Matrix
20 Year Assessment

New Materials Posted March 25, 2005
137-EI-100 ATC Filing Letter March 25, 2005
137-EI-100 ATC Access Initiative Status Report March 25, 2005

Access Decision Matrix

New Materials posted March 22, 2005
Attached please find the current draft of the cover letter to the Access filing (PSC Docket #137-EI-100) that ATC will submit to the Public Service Commission of Wisconsin on Friday, March 25. 2005. ATC continues to review the both the filing and the cover letter documents.

Please forward any comments to Julie Voeck, jvoeck@atcllc.com, no later than noon on Wednesday, March 23.

New Materials posted March 18, 2005
DRAFT ATC Access Initiative Status Report and Update - to the PSCW (3-25-2005) Docket #137-EI-100
Table 1
Table 2
Table 3

New Materials posted March 17, 2005
February 14th Access Meeting notes

New Materials posted March 9, 2005
Comments and ranking totals from sensitivities feedback form

Meeting materials for Feb. 14, 2005 Access Customer/Stakeholder Meeting
Agenda
Anti-trust reminder
Objectives and Timeframe
PROMOD Economic Analysis
Multiple Draws -- Statistical Analysis
Access Decision Matrix
20 Year Analysis Initiative

Meeting materials for January 20, 2005 MEUW Meeting
ATC Presentation to the MEUW

New Link posted December 22, 2004
Report by the California ISO on modeling actual bidding behavior

New Materials posted December 7, 2004
December 1st Access Meeting notes

Meeting materials for Dec. 1, 2004 Access Customer/Stakeholder Meeting
Agenda
Anti-trust reminder
Access Comments -- November 17th, 2004
Access Matrix
Chronic Limiters
PROMOD Economic Analysis
Access Decision Matrix
All Projects Packages
Access Initiative Diagrams
1999-2014 Maximum Simultaneous TTC to ATC System Load Ratios

Meeting materials for November 10, 2004
Access Initiative -- October 1, 2004 Customer/Stakeholder Meeting

New Materials posted October 6, 2004
Decision Matrix
Environmental Screening Summary
Environmental Screening Tables

Meeting materials for Oct. 1, 2004 Access Customer/Stakeholder Meeting
Agenda
Access Initiative -- September 1, 2004 Customer/Stakeholder Meeting
PROMOD Economic Analysis
Access Decision Matrix -- Feedback and Factors
WPPI's Comments on Access Initiative
Access Decision Matrix -- Tables

September 24, 2004 presentation to PROMOD Users Group
Evaluation Transmission Projects in an LMP Market

Updated Decision Matrix spreadsheet, posted September 15, 2004
Access Decision Matrix
Please reply with any comments by EOB, Friday, September 24th. If you have questions, please contact Dale Burmester at 608-877-8109.

Updated Decision Matrix spreadsheet, posted September 14, 2004
Access Decision Matrix
Please reply with any comments by EOB, Friday, September 24th. If you have questions, please contact Dale Burmester at 608-877-8109.

Meeting materials for 9/1/04 Access Customer/Stakeholder Meeting
Agenda
Master Access Schedule
Access Initiative -- August 3, 2004 Customer/Stakeholder Meeting
Updated Simultaneous TTC
Control Area to Control Area TTC
Correlate TLR Activity to Affected WUMS Import Directions
PROMOD Economic Analysis
Revised Import & Voltage Stability
Scenario Analyses: Transfer Capability Comparisons
Access Decision Matrix

August 9, 2004 update

Baseline Study
Shadow Prices
Capacity Factors
Base Case Tie Line Flows
Base Case plus Fixes
Byron-NMA Flows
Salem-NMA Flows
120% Generation Study
Shadow Prices
Capacity Factors
Base Case Tie Line Flows
Base Case plus Fixes
Byron-NMA Flows
Salem-NMA Flows
90% Nuclear Retired Study
Shadow Prices
Capacity Factors
Base Case Tie Line Flows
Base Case plus Fixes
Byron-NMA Flows
Salem-NMA Flows
Iowa Wind Study
Shadow Prices
Capacity Factors
Base Case Tie Line Flows
Byron-NMA Flows
Salem-NMA Flows
Combined Tie Line Flows
East across Lake
North to Canada
West Adams-Columbia

Historical and Potential Future Access Study August 6, 2004

Chronic Limiter Update August 6, 2004


August 4, 2004: Simultaneous Transfer Capability Projections
ATC to Control Area Summary
Control Area to Control Area Summary
Ties to Control Area Summary
ATC (plus NSP and CE) to Control Area Summary

Meeting materials for 8/3/04 Access Customer/Stakeholder Meeting:
Agenda
Access Initiative -- July 7, 2004 Customer/Stakeholder Meeting
Master Access Schedule
Outage Coordination
Correlate TLR activity to Affected WUMS Import Directions: PDF, PPT
PROMOD Economic Analysis
Transient Stability Impact -- Columbia Generating Station
Reliability Assessment Expected Unserved Energy(EUE)
Strategic Issues
Access Initiative Decision Matrix
Access Value Case
Next Steps

PROMOD output data from baseline studies presented 7/7/04 Access Customer/Stakeholder Meeting:
Capacity Factors 7/19/04
Salem-NMA tie line flows 7/19/04
Byron-NMA tie line flows 7/19/04
Base Case plus fixes tie line flows 7/19/04
Base Case tie line flows 7/19/04

Meeting materials for 7/7/04 Access Customer/Stakeholder Meeting:
Agenda
Access Initiative Overview
Master Access Schedule
ATC map with flowgates highlighted
PROMOD Benchmarking
PROMOD Economic Analysis
LOLE Reliability Analysis
Loss Energy and Capacity Cost Savings
Access Decision Matrix (Preliminary Draft)
Access Study Initiative

Meeting materials for 6/2/04 Access Customer/Stakeholder Meeting:
2004 ATC Access Study Initiative White Paper (2nd draft)
Access Initiative Overview
Agenda
Chronic Limiters
Ensuring Comparable Access with PROMOD
Historical and Potential Future Access Study
Master Access Schedule
PROMOD Overview
PROMOD Economic Analysis Early Results
Scenario Analysis

Meeting materials for 4/21/04 Access Customer/Stakeholder Meeting:
Invitation and Agenda
Transmission Access
Phase I Access Analysis

Meeting materials for 4/7/04 Access Customer/Stakeholder Meeting:
Agenda
Phase I Access Analysis
Transmission Access



 
Copyright 2008 American Transmission Company. All Rights Reserved